WORKBENCH!
In this section we post current items in production, and newly completed works. Clients
get a weekly update of the progress on their projects, and we post the final results here.
PRODUCTION PICTURES!
INTERNAL LIGHTING CCFL'S IN A MARTIAN WAR MACHINE
QUESTIONS? CALL (386) 295-7997 FOR ANSWERS!
1/350TH SCALE ENTERPRISE REFIT UPPER SAUCER LIGHTING
UPGRADES & AUGMENTS
THERE ARE COUNTLESS POSSIBILITIES FOR EACH AND EVERY PROJECT. LIGHTING,
SPECIALTY PAINTING, EVEN SOLID STATE LASER BEAMS! THESE ARE JUST A FEW
OF THE MANY AVAILABLE UPGRADES THAT YOU CAN INCLUDE IN YOUR  PROJECT!
MINIATURE LOW INTENSITY LASER SYSTEMS
SPECIALTY PAINT & WEATHERING EFFECTS
"CUTTING EDGE" ELECTRONIC LIGHTING
STUDIO QUALITY ST "AZTEC" TILING EFFECTS
CLASS I LASERS REQUIRES SAFE OPERATION BY A RESPONSIBLE ADULT
VOYAGER'S FULLY LIGHTED SHUTTLE & BAY
THIS IS THE PRODUCTION SCHEDULE, FOR ALL PROJECTS, WITH A RESERVED PRODUCTION TIME
SLOT. CLIENTS HAVE PUT DOWN A 50% DEPOSIT TO RESERVE THE SLOT FOR THEIR PROJECT(S),
SEEN POSTED BELOW. THE TIMES ARE "ESTIMATES" ONLY, BASED ON SIMILAR PRIOR PROJECTS.
LIGHTED LASER-ETCHED DEDICATION PLAQUES
PRODUCTION SCHEDULE 2008-2010
CLASS IIIE LASER REQUIRES SAFE OPERATION BY AN INFORMED ADULT
MINIATURE HIGH INTENSITY LASER SYSTEMS
1/350TH ENTERPRISE SHUTTLE & BAY WITH CREW
PRODUCTION SHOT OF BAY IN PROGRESS
INTERNAL LIGHTING SYSTEM IN VOYAGER BEING INSTALLED
LIGHTED "FLYING SUB" BUILD ON THE WORKBENCH
"NOSTROMO" FREIGHTER DURING  ELECTRICAL ASSEMBLY
LOW INTENSITY LASERS REQUIRE SMOKE/DUST PARTICLES TO BE VISIBLE
HIGH INTENSITY LASERS CAN BE CLEARLY SEEN IN LOW LIGHT CONDITIONS
37 INCH TYPE VII-C U BOAT DISPLAY WITH BRASS "ACCURIZING" LASER ETCHED PARTS &  WEATHERING EFFECTS
THINKING OF MAKING AN ORDER? READ TEXT BELOW FIRST, THANKS!
CUSTOM-MADE PRESENTATION DISPLAYS
HIGHLY DETAILED SHUTTLE BAYS & SHUTTLES
THE NEW  2008  "USS VOYAGER" PROP REPRODUCTION!
OUR LATEST STUDIO VERSION FEATURES MORE "GOODIES"!
SUMMER 2008
OUR "TOP OF THE LINE" SPECIAL ORDER J2 SAUCER
THE GEMINI XXII, THE ORIGINAL FIRST SEASON JUPITER 2!
FALL 2008
LATE SUMMER 2008
1/350TH ENTERPRISE BASE INTERNAL ELECTRONICS
18 INCH U.S.S. ENTERPRISE DURING LASER TEST SESSION
SPECIAL ORDER JUPITER 2'S GYRO DURING ASSEMBLY
OUR "TOP OF THE LINE" SPECIAL ORDER JUPITER 2 SAUCER
OUR LATEST SPECIAL ORDER VERSION!
WINTER 2008 INTO 2009
WINTER 2009-EARLY SPRING
STANDARD EDITION JUPITER 2, WITH "ALIEN TERRAIN" BASE
HERE, A "PEEK" AT SOME OF THE PROJECTS DURING VARIOUS ASSEMBLY STAGES. SOME OF
THESE BUILD-UPS ARE
EXTREMELY COMPLICATED & REQUIRE MANY MONTHS TO COMPLETE.
LIGHTED MOEBIUS CHARIOT KIT WITH FIGURES & B9!
LATE FALL-WINTER 2008
FULLY LIGHTED & DETAILED MOEBIUS LOST IN SPACE "POD"
SPRING 2009!
FUNCTIONING DEFLECTOR CONTROL DISPLAY !
SPECIAL ORDER VERSION CUSTOM DISPLAY BASE & COVER!
UPGRADED,
BY CLIENT!
CUSTOM DECALS & LASER-ETCH BRASS PARTS
CUSTOMIZED DIORAMAS IN VARIOUS THEMES
PRODUCTION SHOT OF "FLYING SUB" IN "UNDERSEA DIORAMA" PROJECT
STANDARD EDITION JUPITER 2 SAUCER DISPLAY
SUMMER 2009!
GERMAN TYPE VII-C U-BOAT PROJECT
PROJECT NOW IN PRODUCTION!
BLADE RUNNER "SPINNER" AND SUPERB LIGHTING EFFECTS
THE PROJECT I WANT TO BUILD THE MOST
THE BRAND NEW 39 INCH "SEAVIEW" MODEL KIT
THE MAIN HULL DISPLAYED ON MY WORKBENCH
THE BUILD CAN BE MADE "SEA WORTHY" AS AN
RC SUB, WITH A MOUNTED CAMERA & VIRTUAL
GOGGLES, TO VIEW THE ACTION UNDERWATER!
THE FLYING SUB CAN HAVE INTERIOR & EXTERIOR LIGHTING
AN "RC" VERSION ,WOULD TAKE APPROX. ONE YEAR TO BUILD
& THE FEE TO DO IT "TOP-NOTCH", WOULD BE CONSIDERABLE
A "PROP" QUALITY VERSION WOULD HAVE FULLY ILLUMINATED
INTERIOR & EXTERIOR, AS A "NON-RC" BUILD, IT WOULD TAKE
APPROX 8 TO 9 MONTHS. I'M PRAYING TO GET THIS ON ORDER
IF YOU'VE ALWAYS WANTED A LARGE SCALE, "SEAVIEW"
WITH HIGHLY DETAILED, & LIGHTED CONTROLS, CALL ME!
ANYONE INTERESTED IN AN AMAZING SEAVIEW MODEL?
MANY NEW LIGHTING OPTIONS, INCLUDING FORWARD LASERS,
AND THE COMPUTER "WATERFALL" EFFECT, READY TO ADD,
TO THIS FANTASTIC MODEL, WHEN A CLIENT DOES ORDER IT!
THE LIGHTING COULD MATCH OUR LARGER SCALE VERSION
THE 39 INCH OVERALL LENGTH IS EXTREMELY IMPRESSIVE!
WOW!
A FEW OF THE HUNDREDS OF REFERENCE IMAGES I HAVE ON FILE, OF THE SEAVIEW & THE FLYING SUB'S INTERIOR & EXTERIOR
ALL IMAGES ARE THE PROPERTY OF 20TH CENTURY FOX STUDIOS, SHOWN HERE AS REFERENCE MATERIAL ONLY
SPINNER LIGHTING EFFECT
BALLAST PORTS BEING CARVED OUT, ONE AT A TIME
LASER-ETCHED DETAILING BRASS
A MULTITUDE OF DREMEL BITS
HIGH MAGNIFICATION EYE-WEAR
SOME OF THE AFTER-MARKET AUGMENTS FOR THIS PROJECT
TINY "TURNBUCKLES" FOR DETAILING RIGGING LATER ON
HELD STEADY BY MY TRUSTY PANAVISE, CUTTING CONTINUES
WE WILL GET TO THESE "GOODIES", BUT PREP WORK IS FIRST
13" ILLUMINATED STARSHIP "YAMATO"  MODEL DISPLAY

PRODUCTION SLOT OPEN FOR  
START OF
2010!

CONTACT ME VIA E-MAIL OR
THE SERVICE PHONE NUMBER!

WHAT CAN I DO FOR YOU?

PRODUCTION SLOT OPEN FOR
EARLY 2010!

CONTACT ME VIA E-MAIL OR
THE SERVICE PHONE NUMBER!

WHAT CAN I DO FOR YOU?
"BANZAI!"
LATE SUMMER THROUGH  FALL 2009!
WINTER 2009-EARLY 2010